The Boat House, Knightsbridge

Hammer
Type

High End Residential

User
Client

Undisclosed

Clock
Duration

50 weeks

Clock
Value

2.5m

The works included:

  • Underpinning all-round the building
  • Strengthening of existing spine wall
  • Basement dig
  • Strengthening of existing floors
  • Heavy structural alterations to the structure of the building to change the building into two dwellings
  • New high roof structure with Zinc finishes