Project Information

Client: Chorus Group
Duration: 25 weeks

North Audley St. Apartments Mayfair

The project consisted of the fit out of luxury flats in North Audley Street, Mayfair based on:

  • 1st floor 3no flats for high end rental market
  • 2nd floor 3no flats for high end rental market
  • 3rd‐4th‐5th floor 3no flats (which is based on 3 flats over the 3 floors, with roof terraces.
    (with a value of £4.5 Million each)
  • Common areas and reception area, and basement works.

CGA were responsible for all party walls and internal walls, suspended ceilings and the light troughs/b/heads and recesses to all bedrooms. We provided switchable glass to bathrooms and all timber panels to bathrooms.

The ceiling grid system is made up of MF metal comprising of MF7 support channels which are supported by 25 x 25mm galvanised angle fixed direct to the slab or sub grid. MF5 top hat sections are fixed to the support channels by MF9 clips.

Finally the plasterboards are screwed to the MF metal which then has a skim coat plaster finish by others ready for decoration also by others Gypsum cored plasterboard ceilings, p/board margins & p/board b/heads are constructed in areas designated by the main contractor by means of a metal furring (MF) grid fixed to the structural soffit by means of steel 25 x 25 angle hangers or steel strip.

All MF ceilings and partitions were presented ready for decoration by others. Partitions were installed throughout the property, in locations as specified using Gypframe steel studs, lined with plasterboard as specified and plaster skim finish decoration by others.

We were on site for 25 weeks and worked very closely with Latitude architects to overcome some challenging details.