1 London Wall

Hammer
Type

Commercial Fit-out

User
Client

Hasainvest

Clock
Duration

10 weeks

Pound sign
Value

The works involved the taking down and removal of the suspended metal ceiling tiles (including perforated, ‘specials’ and multi‐integrated services tiles) and ‘C’ channels. The team then repaired/refixed the existing retained base build cavity barrier above the suspended ceiling, as necessary and reinstate the South East corner dry lining (where condensation mould was present) with insulation backed plasterboard, tape all joints and leave ready for decorations. 

The team then supplied and fixed new metal pan suspended ceiling in accordance with Work Section 3.3. System to be SAS System 330 Linear plank ceiling, with perforation pattern 1522 and colour RAL 9010, 20% Gloss, in layout to match base build, including acoustic attenuation backing pad. 

Finally, repairs and reinstatement of the plasterboard perimeter margin as necessary to match reflected ceiling plan all in accordance with Work Section 3.3 were carried out to complete the project.